Silversark Construction Douglas fir strips laminated to make framesFrames erected on building jig, with keelson and sheer clampsLongitudinal stringers fastened to framesFirst two plywood strips in first of three layers glued and nailedPlanking complete, ballast keel and skeg laminated in placeTurning over with tackles while hanging in two slingsExterior complete, with three coats of epoxyInterior complete, epoxy-coated and varnishedLaunching day: I'se the b'y that builds the boat...